Timberborn
2026

Timberborn

No ratings yet
Developer: Mechanistry
Game Modes Single player
Themes Sandbox, Survival
Perspective Bird view / Isometric
Critics Score 86/100 (1 review)

Summary

Humans are long gone. In a world struck by droughts and toxic waste, will your lumberpunk beavers do any better? Timberborn is a sandbox city-building game featuring ingenious animals, vertical architecture, water physics, and terraforming. Contains high amounts of wood.

Storyline

Mankind turned Earth into a dry wasteland and perished, but some species adapted and evolved. Pick one of the beaver factions and see how long your colony can last.

Videos

Screenshots

Discussion

Log in to join the discussion.

Reviews

No reviews yet. Be the first!

Log in to write a review.